TRACKPADS History Wins the Future Back to Trackpads
A TRACKPADS COLLECTIONRESEARCH LIBRARY
ARMOR · January-February 1993

Army Plans New Smoke Vehicle

Author not identified in source metadata
pp. 39–49Features1993

Article

Digitized from the original journal. Page headers, page numbers, photo credits, and obvious layout artifacts have been removed; transcription errors may remain. Submit a correction if you spot one.

The Army is investigating conversion of M901 Improved TOW Vehicles to smoke generator vehicles that will replace the M1059s now in the inventory. Like the M1059, the new Large Area Mobile Protected Smoke System ( LAMPSS ) would be built on the M113-style chassis, but the smoke generating equipment would be far more advanced than the 1940s-era technology on the M1059.

Instead of the TOW-launching "hammerhead" on the M901, the new vehicle would have a launcher for smoke rockets capable of projecting a smoke Screen out to a distance of six kilometers.

In addition, the smoke generator on the vehicle would be capable of tailoring its smoke to specific screening purposes; for example, the defeat of infrared sighting equipment, night-vision aids, thermal viewers, or image intensifiers. It would do this by injecting carbon-based particles with the oil that is burned to create the "fog." One smoke variant would be able to mask troops and vehicles from the millimeter-wave seekers on the newest generation of guided weapons. Other changes to the ITV would include a land navigation and turret positioning system, improved engine and transmission to increase horsepower from 212 to 300, and better accommodations for the crew of three, to include a operator. driver, The commander, and smoke-genemtor be ab*e to genemte smoke Not a PfOtOWPe. but a technology demonstrator Of a system that will both generate and project smoke from a tracked camer, the LAMPSS carrier has been exhibited at the Armor Conference, 1 lth Worldwide Chemical Conference, and at Aberdeen Proving Ground's Armed Forces Day show. It was fabricated in only 45 days at Red River Army Depot, Texas. for about an hour before requiring refueling. 44 ARMOR -

End of indexed article

Citation

Sergeant First Class John M. Duezabou. “Army Plans New Smoke Vehicle Small Unit Terrain Board Exercises.” ARMOR, January-February 1993, pp. 39-49.

“Army Plans New Smoke Vehicle.” ARMOR, January-February 1993, pp. 39-49.

HELP IMPROVE THE RECORDSee something that should be corrected?

Report a transcription error, attribution issue, page-boundary problem, or stronger source. The article title and URL will be attached automatically.

Submit a correction →

Read deeper with Trackpads Books

Trackpads books turn research themes into longer narrative and reference works. Book purchases help support the project.

Explore Trackpads Books ↗

Listen to the history

Continue with Trackpads podcasts for military-history series, interviews, and narrated features.

Browse Trackpads Podcasts ↗